With a great deal of reclaimed land being created there is a demand for working in the precast concrete storm-water culverts that lay beneath. As an underwater construction company we are more than suited to working even long distances inside this challenging environment. Also see our Confined Space page.
During investigation works it was discovered a section of floor had been eroded inside a storm water drain beneath Waterloo Road, Kowloon. Our company was asked to present a proposal to rectify the missing floor and then employed to carry out the repairs.
- Missing floor
- Mesh reinforcement
- Grout pipes
- Grout delivery
- Grout pour
- Repaired floor
El rápido variación: el…
The Short variation: union expert Kimberly Moffit is…