+852-2341-3696
wod@netvigator.com
2/F, Hip Wo Ind. Building
Mongkok Kowloon, HKSAR

Job Reference

The job reference in recent 5 year by our company

 Job No. Client/Main Contractor Project Description of Work
2019-124 Alchmex – Paul Y Joint Venture  HY/2018/02
Central Kowloon Route – Kai Tak East

 

CCTV Inspection of Nullah

Removal of silt at Kai Tak River

Condition survey to Kai Tak River box culvert

2019-116 CLP Power Hong Kong Ltd., Castle Peak Power Station Inspection and desilting
2019-114 CLP Power Hong Kong Ltd., Black Point Power Station Annual maintenance work to intake heads, dosing pipe and forebay
2019-107 Kum Shing Electrical & Mechanical Black Point Power Station A
 Cooling Water Pumphouse
Plug and unplug the seawater manifold
2019-103  Architectural Services Department Kwun Tong Swimming Pool Repair the loosen pool tiles and defective hollow render
2019-093 PMPS Liner Technology (Hong Kong) Ltd., Contract No. DC/2015/02
Drainage Maintenance and Construction 
Inspection to outfall pipe
2019-068 Chu Kong Group Shipyard Co., Limited Skypier Pontoons’ Mooring System Replacement of hawsers and superflexes for Hoi Tin I and II

2019-067

CLP Power Hong Kong Ltd.,

Castle Peak Power Station

Condition survey and pile thickness measurement

2019-065

Paul Y Construction Co. Ltd., Contract No. 19-83003
South Horizons (West) and Luk Chau Wan (Sea Portions)
Remedial works for 275-kV Cable Landing Points
2019-054 The Hongkong Electric Co. Ltd. Contract no. 19-81003
Refurbishment of East Wharf at Lamma Power Station
Replacing Existing Turnbuckle of Frontal Frame No.3
2019-042 The Jardine Engineering Corporation Ltd., Lamma Power Station Upgrading of Marine Fenders at West Heavy Unloading Area
2019-035 Prominent Environmental Ltd., Hong Kong International School Inspection and assist to adjust the cable tension of the swimming pool
2019-033 Welcome Const. Co. Ltd. – Riseway Const. Eng. Ltd. JV Contract No. DC/2015/02
Drainage Maintenance and Construction in Mainland South Districts 
Po Kong Village Road and Fung Tak Road
Condition survey to box culvert
2019-024 Chu Kong Group Shipyard Co., Limited Skypier Pontoons’ at Hong Kong International Airport CCTV inspection to the condition of Pontoon
2019-009 ATAL Engineering Ltd., Existing Government Pumphouses at West Kowloon Cultural District Installation and removal
2019-006 Alliance Professional Surveyors Co. Ltd. Kai Tak Temporary barging point Diving inspection to seawall and seabed
2019-005 Victory Engineering Service Co. Ltd. Tender 1256EM18W
Hong Kong Coliseum Seawater Pumphouse
Plug and unplug off the water inlet
2019-004 Fugro (Hong Kong) Ltd., Aviation Fuel Receipt Facility (AFRF) at Sha Chau Condition survey to all marine piles of MD1
2019-002 ERM-Hong Kong Ltd., Hong Kong Offshore LNG Terminal Supply, installation, removal and monitoring of C-Pod
       
2018-127 Ciel & Terre China, Shek Pik Reservoir Replacement of mooring system
2018-120 Chu Kong Group Shipyard Co. Ltd. Sky Pier: Hong Kong International Airport Seabed Detection at Jetty Pier
2018-102 CLP Power Hong Kong Ltd., Black Point Power Station Annual maintenance work to intake heads, dosing pipe and forebay
2018-098 Kum Shing Group, Castle Peak Power Station A
Cooling Water Pumphouse
Dimensional survey to seawater manifold
2018-094 Fyfe (Hong Kong) Ltd., Eastern Harbour Crossing Tunnel Inspection of seaside anode and reference electrodes
2018-093 TIML MOM Ltd., Marine Works within the TMCA Marine Diving Inspection for features and facilities
2018-075 The Hong Kong Shipyard Ltd., The Hong Kong Shipyard Jetty Pier Supply and installation of silt curtain on the west side of jetty pier
2018-068 Sun Fook Kong(Civil)Ltd., Contract No. DC/2009/10
harbour Area Treatment Schage 2A
Upgrading Work 
Installation and Remover of Bulkheads
2018-065 REC Engineering Co. Ltd., Cheung Sha Wan Wholesale Food Market Fabrication, installation and removal of temporary bulkhead
2018-060 Welcome Const. Co. Ltd. – Riseway Const. Eng. Ltd. JV Contract No. DC/2013/07
Drainage Maintenance & Construction in Mainland North District (2015-2019)
CCTV inspection to box culvert at Lung Sum Avenue
2018-059 Drainage Services Department, Contract No. DC/2016/02
Building & Civil Maintenance & Minor Worksto DSD Plants and Facilities (2016-2020)
Penstocks Leakage Mitigation Measures at
Tsing Yi PTW, To Kwa Wan PTW, Kwun Tong PTW and Kwai Chung PTW
2018-057 New World Construction Co. Ltd., 14104 Avenue of Stars Condtion survey works to existing seawall
2018-049 Lucky Engineering Co. Ltd. Stonecutters Island Naval Base Seawater Pumphouse Assist to lift up the barscreen
2018-048 Prominent Environmental Ltd., Hong Kong International School Annual inspection to swimming pool movable floor
2018-046 Modern Terminals Ltd., Kwai Chung Container Terminal No. 2 Check the sheetpiles condition
2018-038 Welcome Const. Co. Ltd. – Riseway Const. Eng. Ltd. JV Contract No. DC/2015/02
Drainage Mainteance and Construction in Mainland South Districts (2015-2019)
CCTV inspection to decked nullah
2018-031 TJ Engineering Services Ltd., World Wide House, 19, Des Voeux Road Central Supply and Replacement of the Penstocks at Sea Water Pump Room
2018-028 CLPe Solutions Ltd. Contract T17M202 – Underwater Facilities
Hongkong International Airport
Supply and reinstate the Fiberglass staircase at SWPH1
2018-027 P & A Engineering Ltd., Kowloon Park Swimming Pool Installation and Removal of Support Stands

2018-020

Drainage Services Department, Contract No. DC/2016/02
Building & Civil Maintenance & Minor Works
to DSD Plants and Facilities (2016-2020)
Robotic CCTV Inspection and Leakage Mitigation Works of the
Submarine Outfalls of Chai Wan Preliminary Treatment Works (PTW)
2018-017 Wise Engineering & Surveying Co. Ltd.,

DSD Contract No. DC/2009/24
HATS Stage 2A – Upgrading of Preliminary Treatment Works at
Sandy Bay, Cyberport, Wah Fu, Aberdeen and Ap Lei Chau

Diver Survey for Existing Seawall at Ap Lei Chau

 

2018-009

 

TJ Engineering Services Ltd.,

 

World Wide House, 19, Des Voeux Road Central

Cleaning the guide rail and mesh screen
2018-008 CRBC-Build King Joint Venture, Contract No. NE/2015/02
Tseung Kwan O – Lam Tin Tunnel – Road P2 and Associated Works
CCTV and silt thickness measurement to 1350mm Ø drainage pipe
       
2017-136 Hsin Chong Construction Co. Ltd., Main Works for M+ Museum Project at West Kowloon Cultural District Dismantling the existing intake screen in seawater pump cell No. 13 at Seawater Side
2017-135 Shiu Wing Steel Ltd., Shiu Wing Steel Mill, Area 38 Removal of silt inside the intake chamber
2017-124 Sun Fook Kong – Biwater Joint Venture, Contract No. DC/2009/10
Harbour Area Treatment Scheme Stage 2A
Upgrading Works at Stonecutters Island Sewage Treatment Works –
Main Pumping Station, Sedimentation Tanks and Ancillary Facilities
Dimension survey for existing connecting audit
2017-121 Paul Y Builders Ltd.,  Residential Development at
9, Muk Ning Street, NKIL 6527
Plug and unplug off the 600mm Ø stormwater pipe
2017-117 MCW Marine Services Ltd kypier Pontoons’ at Hong Kong International Airport CCTV inspection to the condition of Pontoon
2017-116 MCW Marine Services Ltd

Contract No. DC/2015/02
Drainage Mainteance and Construction in Mainland South Districts (2015-2019)
Waterloo Road Box culvert

 

CCTV to investigate the box culvert condition
2017-110 Drillcut Ltd., Contract No. DC/2009/10
Harbour Area Treatment Scheme – Stage 2A
Upgrading works at Stonecutters Island Sewage Treatment Works
Provision of diving team to assist underwater cutting works
2017-109 Biwater Man Lee Ltd., West Kowloon Seawater Pumphouse Installation and Removal of Plug
2017-107 CRBC-Build King Joint Venture, Contract No. NE/2015/02
Tseung Kwan O – Lam Tin Tunnel – Road P2 & Associated Work
Installation and welding of steel plate to cover temporary cofferdam type 2 gap by Diving Method
2017-106 Paul Y. Construction Co. Ltd., Contract No. DC/2016/02
Building & Civil Maintenance & Minor Works
to DSD Plants and Facilities (2016-2020)
Submarine Outfalls of Shau Kei Wan Preliminary Treatment Works
Robotic CCTV Inspection and Leakage Mitigation Works of the
2017-103 Chu Kong Group Shipyard Co., Limited Skypier Pontoons’ at Hong Kong International Airport CCTV inspection to the condition of Pontoon
2017-096 Fyfe (Hong Kong) Ltd., Eastern Harbour Crossing Tunnel
Cathodic Protection Design
CCTV inspection to anodes and reference electrodes
2017-095 Chu Kong Group Shipyard Co., Limited Skypier Pontoons’ Mooring System
Hong Kong International Air
Provision of Protection & Indemnity to Working Boat
2017-092 Welcome Construction Co. Ltd. Northern Area Phase II, West Kowloon Reclamation Dimensional survey to box culvert and equalizing hole
2017-085 Dongah Geologicial Engineering Co. Ltd., Vessel: Dong J-1 No. 5 Cutting of Rig
2017-078 Kiu Lok Service Management Co. Ltd., Seawater Intake of the New Seawater Supply System at New World Centre
18-24, Salisbury Road, Tsim Sha Tsui, Kowloon (2017-2018)
Cleaning and Inspection
2017-074 M.Y. Cheng & Co. Eng. Ltd., Castle Peak Power Station Plug and unplug off the B1 and B2 intake pipe
2017-070 Leighton-China State Joint Venture SCL1123 – Exhibition Station and Western Approach Tunnel
T0255
Area E – Fabrication, Installation and Dismantling of Temporary Steel Bulkheads in Box Culvert
2017-059 CLP Power Hong Kong Ltd., Black Point Power Station CCTV inspection and Dimensional survey to SCWP intake culvert
2017-045 CLP Power Hong Kong Ltd., Black Point Power Station Inspection, cleaning and desilting work
2017-041 Hsin Chong Construction Co. Ltd., Main Works for M+ Museum Project at West Kowloon Cultural District Underwater Inspection and Capping off/ Uncapping of Existing Water Pipe
2017-036 Prominent Environmental Ltd.,

Hong Kong International School
Lower Primary School Redevelopment
Repulse Bay Campus, Hong Kong.

Connection of wire to the pulley system of swimming pool
2017-026 TJ Engineering Services Ltd., World Wide House, 19, Des Voeux Road Central Cleaning the guide rail and mesh screen
2017-025 Yee Hop Construction Co. Ltd., Castle Peak Power Station  CPPS Jetty – Pile Thickness Measurement & Pile Wrapping System
2017-016 CLP Engineering Ltd., Tender Ref. WSD/ST454/16
Supply and Installation of a Floating Solar Power System
at Plover Cove Reservoir
Installation of Anchoring system

2017-003

Wise Engineering & Surveying Co. Ltd.,

XRL 811B – WKT Approach Tunnel (South)
Nam Cheong Barging Point Reinstatement

Condition survey to seawall
2017-002 REC Engineering Co Ltd., Shek Pik Reservoir  Underwater Anchoring Installation
Underwater diving services
2016-148 Tong Kee Engineering Ltd., Castle Peak Power Station
Jetty Refurbishment Works
Provision of diving team to assist underwater works
2016-138 CLP Power Hong Kong Ltd., Black Point Power Station Inspection, cleaning and desilting work

2016-132

Ciel & Terre China,

Shek Pik Reservoir
Underwater Anchoring Installation

Underwater diving services
2016-128 Top Exxpress Construction Engineering Ltd., Contract No. DC/2013/01
Tolo Harbour Sewerage of Unsewered Areas, Stage 2 Phase 1
CCTV inspection to condition of box culvert
2016-123 Samsung – Build King JV,  Three Runway System Project Contract 3202,
Deep Cement Mixing Works (Package 2)
Underwater Diving Inspection
2016-120 CLP Power Hong Kong Ltd., Castle Peak Power Station Removal of marine debris at B4 Drum Screen Pit
2016-119 Castle Peak Power Station Castle Peak Power Station Demolish the B4 No. 11 Coarse Screen
2016-112 Dragages-Bouygues Joint Venture, MTR SCL Contract 1128
Shatin to Central Link (Hong Kong Section)
Removal of blockage inside 1200mm Ø storm water pipe
2016-109 BMT Asia Pacific Ltd., Skypier Pontoons’ at Hong Kong International Airport CCTV inspection to the condition of Pontoon
2016-105 CLP Power Hong Kong Ltd., Castle Peak Power Station Inspection and Desilting to CW forebay, CPB Station
2016-100 Welcome Construction Co. Ltd. The Public Housing Department at
Cheung Sha Wan Wholesale Food Market Site 3 and Site 5
Design, Fabricate and Installation of Temporary Bulkhead for Fat Tseung Street Culvert
2016-082 China Harbour Construction Co. Ltd. MTR SCL Contract 1128
Shatin to Central Link (Hong Kong Section)
Strengthening the column with Quad Shore
2016-081 Jacobs China Ltd., Permanent Aviation Fuel Facility Services for PAFF Jetty Structural Inspection
2016-073 Tai Ah Engineering Co. Ltd., Kwun Tong SPS Plug and unplug the sump inlet penstocks
2016-070 CLP Power Hong Kong Ltd., Castle Peak Power Station Inspection to North and South Lagoon
2016-069 Winning Engineering & Consultants Co., Stonecutters Island Naval Base Seawater Pumphouse Plug and unplug the seawater intake pipe
2016-068 Unison Construction Engineering Ltd., Shatin Sewage Treatment Works Assist the lifting of pump inside the aeration tank
2016-067 WCCL-RCEL JV  Contract No. DC/2015/02
Mainland South Division
Drainage maintenance & Construction in Mainland South Districts (2015-2019)
Installation and removal of contaminated boom
2016-066 Wenden Engineering Service Co. Ltd. Government Office at Yaumatei Seawater Pumphouse Plug off the seawater intake

2016-056

Chu Kong Group Shipyard Co., Limited

Skypier Pontoons’ Mooring System
Hong Kong International Airport

Provision of Protection & Indemnity to Working Boat
2016-037 Modern Terminals Ltd., Ref. No.: 331-Q20013-JL
Terminal 5 Quay Piles Condition Survey (Phase 2)
Variation work – Condition survey for additional piles
2016-029 ERM-Hong Kong Ltd., South of Lantau Island between Shek Kau Chau and Soko Islands Placing of monitoring C-Pod device and holder
2016-028 TJ Engineering Services Ltd., World Wide House, 19, Des Voeux Road Central Cleaning the guide rail and mesh screen
2016-025 Sun Fook Kong – Biwater Joint Venture, Contract No. DC/2009/10
Harbour Area Treatment Scheme Stage 2A – Upgrading Works at
Stonecutters Island Sewage Treatment Works –
Main Pumping Station, Sedmentation Tanks and Ancillary Facilities
Underwater works of Riser Shaft
2016-003 Far East Engineering Services Ltd Shun Tak Centre Seawater Intake Repairing the existing travelling band screen
       
2015-141 Fu Lam Construction Engineering Co. Ltd., Shun Tak Centre Seawater Intake Supply Ham Baker Adams Penstocks & Travelling band Screens
2015-132 CLP Power Hong Kong Ltd., Black Point Power Station Diving works at BPPS and CPPS
2015-124 Welcome Construction Co. Ltd., DSD Contract No. 2012/11
Drainage Maintenance & Construction in Hong Kong Island
and Islands District (2013-2017)
Condition survey to the 4th box culvert off the seawall beyond Golden Bauhinia Square
2015-121 Chun Wo-CEC Joint Venture, Strategic Sewage Disposal Scheme
Stage I – Principal Collection & Treatment System
Inspection to existing box culvert for Effluent Water Discharge at Stonecutters Island
2015-104 Arup, Sham Tseng Submarine Outfall Condition survey with Remote Operated Vehicle
2015-075 Shun Yuen Construction Co. Ltd., Contract No. DC/2012/01
Building & Civil Maintenance & Minor Works to
DSD Plants and facilities (2012-2016)
Inspection to Shatin twin submarine outfall with Remote Operated Vehicle
2015-062 Paul Y Construction Co. Ltd., Project 15/8016
Refurbishment of North Jetty Approach
Strengthening of Pile & Bracing for Pile No. P207-P209